Solar Metering Setup — Sedgman Electrics
    Accredited Metering Coordinator — Solar Ready

    Solar Metering Setup

    Bi-directional meter installation and solar metering configuration for Sydney homes and businesses

    About This Service

    Solar Metering Set Up Correctly

    Solar metering setup involves installing a bi-directional (import/export) meter that measures both the energy your premises draws from the grid and the excess solar energy exported back to it. Standard accumulation meters cannot record export — they must be replaced before a solar system can be connected to the grid and feed-in tariff credits applied. As an accredited metering coordinator, Sedgman manages NMI updates, AEMO registration for solar export, and retailer notification.

    Solar uptake is high across Western Sydney, the Hills District, and the Northern Beaches, where roof space and sun exposure make solar systems highly viable. New solar installations in these areas increasingly require export limiting — a configuration that caps power exported to the network to comply with Ausgrid and Endeavour Energy connection agreements. We configure bi-directional meters with the correct export limit settings from the outset, ensuring your system is compliant and feed-in credits are correctly applied from day one.

    Solar Metering Setup — Sedgman Electrics Sydney
    How We Work

    Solar Metering Setup Process

    1

    Connection Assessment

    We confirm export eligibility, export limit requirements, and meter type with Ausgrid or Endeavour Energy.

    2

    Meter Selection

    We specify the correct bi-directional meter type for your network area, solar system size, and retailer.

    3

    DNSP Coordination

    We notify the DNSP and schedule isolation for safe meter replacement before solar energisation.

    4

    Meter Installation & Export Configuration

    We install the bi-directional meter, configure export limits if required, and confirm solar inverter communication.

    5

    AEMO Registration & Retailer Notification

    We update the NMI for solar export in AEMO and notify your retailer to apply the feed-in tariff.

    Accreditation

    Accredited & Registered

    Licensed, accredited, and compliant with all NSW electrical and network requirements

    Accredited Metering Coordinator (AEMO)

    Registered to manage solar export NMI configuration and bi-directional meter registration in the AEMO metering registry.

    Ausgrid Accredited Service Provider (ASP)

    Authorised for solar metering and export limit configuration across the Ausgrid network area.

    Endeavour Energy Accredited Service Provider

    Accredited for solar metering setup and export configuration across Endeavour Energy network areas.

    Solar Export Configuration Compliant

    Bi-directional meters configured with correct export limits to comply with DNSP connection agreements and AEMO rules.

    AS/NZS 3000 Wiring Rules Compliant

    All solar metering installations completed to the Wiring Rules with certificate of compliance issued.

    Work Health & Safety Act NSW Compliant

    Meter replacement and configuration works completed under documented SWMS and WHS requirements.

    Common Scenarios

    When Do You Need Solar Metering Setup?

    01

    New solar system installation requiring bi-directional meter

    Every new grid-connected solar system requires a bi-directional meter before the DNSP will approve energisation and feed-in tariff registration.

    02

    Existing solar system not receiving feed-in tariff credits

    If your solar is generating but you're not receiving feed-in credits, the meter may not be correctly configured for export — we diagnose and rectify.

    03

    Export limit configuration required by Ausgrid or Endeavour Energy

    Network distributors increasingly require export limiting on new solar connections — we configure meters to the approved export limit from installation.

    04

    Adding a battery requiring updated metering configuration

    Battery additions may require metering reconfiguration to correctly record import, export, and battery charge/discharge for billing purposes.

    05

    Upgrading solar system size requiring metering reassessment

    Larger solar arrays may exceed existing export limits or meter capacity — we reassess and upgrade metering to match the new system size.

    Why Choose Us

    Why Choose Sedgman for Solar Metering?

    Compliance First

    We configure export limits correctly from the outset — no non-compliant solar connections or retailer disputes over metering setup.

    Full Coordination

    DNSP, AEMO, and retailer coordination all handled by us — your solar installer doesn't need to manage the metering side.

    Feed-In Ready

    Your metering is correctly registered for feed-in tariff credits from the first day your solar system is energised.

    FAQ

    Frequently asked questions

    Straight answers about solar metering setup in Sydney.

    Ready to Get Started?

    Contact Sedgman Electrics for solar metering setup across Sydney.

    Get In Touch

    Ready to Power
    Your Project?

    Fill out the form and our team will get back to you within 24 hours. We're here to help with all your electrical needs.

    24/7 Support

    (02) 8559 0085

    Response Time

    Within 24 Hours

    0/1000 characters

    By submitting this form, you agree to our privacy policy and terms of service.