Electricity Meter Installation & Configuration — Sedgman Electrics
    Accredited Metering Coordinator — AEMO Registered

    Electricity Meter Installation & Configuration

    Electricity meter installation and configuration for residential and commercial premises across Sydney

    About This Service

    Your Meter, Done Right

    Electricity meter installation involves installing or replacing a meter at your premises, creating or updating the NMI (National Metering Identifier) with AEMO, and configuring the meter type — accumulation or interval/smart — to match your tariff and network requirements. As an accredited metering coordinator, Sedgman manages this process end-to-end including AEMO registration and NMI creation for new premises, ensuring your meter is correctly registered with your retailer from day one.

    Meter installation is required across Sydney's growth corridors — Marsden Park, Box Hill, and Oran Park — for new connections, when existing meters fail or are found non-compliant, for smart meter upgrades enabling time-of-use tariffs, and for solar systems requiring bi-directional measurement. We coordinate directly with Ausgrid, Endeavour Energy, and your energy retailer so you don't have to manage multiple parties.

    Electricity Meter Installation & Configuration — Sedgman Electrics Sydney
    How We Work

    How We Handle Meter Installation

    1

    Assessment

    We confirm meter type, tariff class, and network requirements with Ausgrid or Endeavour Energy for your premises.

    2

    AEMO Registration

    We create or update the NMI in the AEMO metering registry and register the meter installation with your retailer.

    3

    Isolation

    We coordinate supply isolation with the DNSP for safe meter installation or replacement at your premises.

    4

    Installation & Configuration

    We install and configure the correct meter type — accumulation, interval, or smart — to DNSP and retailer specifications.

    5

    Energisation & Handover

    Supply is restored, retailer registration is confirmed, and metering documentation is provided for your records.

    Accreditation

    Accredited & Registered

    Licensed, accredited, and compliant with all NSW electrical and network requirements

    Accredited Metering Coordinator (AEMO)

    Registered under AEMO National Electricity Rules to manage NMI creation, meter installation, and retailer registration across the National Electricity Market.

    Ausgrid Accredited Service Provider (ASP)

    Authorised for metering and connection works across the Ausgrid network area covering Sydney, Inner West, Eastern Suburbs, and Northern Beaches.

    Endeavour Energy Accredited Service Provider

    Accredited for metering installation and connection works across Western Sydney, Hills District, and Sutherland Shire network areas.

    AS/NZS 3000 Wiring Rules Compliant

    All metering installations completed to the Australian Wiring Rules with certificate of compliance issued on completion.

    Work Health & Safety Act NSW Compliant

    Metering and connection works completed under documented SWMS and WHS requirements for network-side electrical work.

    Common Scenarios

    When Do You Need Meter Installation?

    01

    New premises connection requiring NMI creation and meter installation

    New builds, granny flats, and dual occupancies need a new NMI registered with AEMO and a meter installed before supply can be energised.

    02

    Faulty or non-compliant meter requiring replacement

    Ageing, damaged, or non-compliant meters identified during inspection or retailer audit must be replaced by an accredited metering coordinator.

    03

    Upgrade from accumulation to smart/interval meter for time-of-use tariff

    Switching to a time-of-use tariff requires an interval or smart meter capable of recording consumption in 30-minute intervals.

    04

    Solar system installation requiring bi-directional meter

    Grid-connected solar requires a bi-directional meter to measure both import and export before feed-in tariff credits can apply.

    05

    Change of tenancy or ownership requiring meter reconfiguration

    Property sales, tenancy changes, or retailer switches may require meter reconfiguration and NMI updates in the AEMO registry.

    Why Choose Us

    Why Choose Sedgman for Meter Installation?

    Accredited Metering Coordinator

    We manage NMI creation, AEMO registration, and meter configuration — not just the physical installation.

    Retailer Coordination

    We liaise directly with your energy retailer to ensure your meter is correctly registered and billing-ready from day one.

    All Meter Types

    Accumulation, interval, smart, and bi-directional meters installed and configured to network and retailer specifications.

    FAQ

    Frequently asked questions

    Straight answers about electricity meter installation & configuration in Sydney.

    Ready to Get Started?

    Contact Sedgman Electrics for electricity meter installation & configuration across Sydney.

    Get In Touch

    Ready to Power
    Your Project?

    Fill out the form and our team will get back to you within 24 hours. We're here to help with all your electrical needs.

    24/7 Support

    (02) 8559 0085

    Response Time

    Within 24 Hours

    0/1000 characters

    By submitting this form, you agree to our privacy policy and terms of service.