Metering for New Builds — Sedgman Electrics
    Accredited Metering Coordinator — AEMO Registered

    Metering for New Builds

    Metering installation and NMI creation for new residential and commercial builds across Sydney

    About This Service

    Metering Your New Build Done Right

    Metering for new builds involves installing the electricity meter, creating the National Metering Identifier (NMI) with AEMO, and registering the premises with the customer's chosen energy retailer so billing can commence from the day of energisation. For a new premises, this process also involves coordinating with Ausgrid or Endeavour Energy for the metering installation appointment, selecting the correct meter type for the premises (single phase or three phase, accumulation or interval), and ensuring the meter is configured correctly for any solar system if one is being installed. As an accredited metering coordinator, Sedgman manages the full metering process — not just the physical installation.

    Metering for new builds is required across all of Sydney's active development areas. Greenfield residential estates in the city's growth corridors — Marsden Park, Box Hill, Oran Park, and Gledswood Hills — require NMI creation and meter installation for every new dwelling before occupation. New strata buildings in Parramatta, Macquarie Park, and Chatswood require individual NMIs for each lot plus common area metering. New commercial premises require metering configured for the correct tariff class and, increasingly, with solar metering capability from day one. We coordinate directly with Ausgrid, Endeavour Energy, and the customer's retailer to ensure every new build is billing-ready at energisation.

    Metering for New Builds — Sedgman Electrics Sydney
    How We Work

    Metering for New Builds Process

    1

    Meter Type Selection

    Confirm the correct meter type for the premises — single or three phase, accumulation or interval — based on supply type and tariff requirements.

    2

    DNSP Coordination

    Notify Ausgrid or Endeavour Energy of the metering installation and schedule the energisation appointment.

    3

    NMI Creation

    Create the NMI in the AEMO metering registry, establishing the premises' unique identifier in the national energy market.

    4

    Meter Installation

    Install and configure the meter to DNSP and AEMO specifications, including solar export configuration if required.

    5

    Retailer Registration & Energisation

    Register the NMI with the customer's retailer, confirm DNSP energisation, and ensure billing commences correctly from day one.

    Accreditation

    Accredited & Registered

    Licensed, accredited, and compliant with all NSW electrical and network requirements

    Accredited Metering Coordinator (AEMO)

    Registered to create NMIs, install and configure meters, and coordinate retailer notification in the AEMO metering registry.

    Level 2 ASP — Class 2A & 2D Accreditation (NSW Fair Trading)

    Current ASP accreditation authorising metering installation and connection interface works as part of new premises connections.

    Ausgrid Accredited Service Provider

    Authorised for metering installation and energisation coordination across the Ausgrid network area.

    Endeavour Energy Accredited Service Provider

    Accredited for metering works across Western Sydney, Hills District, and Sutherland Shire Endeavour Energy network areas.

    AS/NZS 3000 Wiring Rules Compliant

    Meter enclosures, wiring, and protection completed to the Wiring Rules with certificate of compliance issued.

    Work Health & Safety Act NSW Compliant

    All metering installation completed under documented SWMS, isolation procedures, and WHS requirements.

    Common Scenarios

    When Do You Need Metering for New Builds?

    01

    New residential dwelling requiring NMI creation and first meter installation before occupation

    Every new dwelling requires an NMI and meter before the certifier can sign off and the owner can occupy — we manage the full process from registry to energisation.

    02

    New strata building requiring individual lot NMIs and common area metering

    Strata developments need separate NMIs for each lot plus dedicated metering for common areas — all created and configured before settlement.

    03

    New commercial premises requiring tariff-class metering and retailer registration

    Commercial premises need meters configured for the correct tariff class and retailer account before fitout and trading can commence.

    04

    New build with solar requiring bi-directional meter and export configuration from day one

    Premises with solar from day one need bi-directional metering with export limits configured correctly for DNSP and retailer requirements.

    05

    Dual occupancy requiring separate NMIs for each dwelling on the lot

    Each dwelling on a dual occupancy lot requires its own NMI and meter — created and registered independently for separate retailer accounts.

    Why Choose Us

    Why Choose Sedgman for New Build Metering?

    Accredited Metering Coordinator

    We manage NMI creation, AEMO registration, and retailer notification — not just the physical meter installation — ensuring your new premises is billing-ready from energisation.

    Coordinated with Connection Works

    Metering is managed as part of the complete new connection process alongside DNSP application and service mains installation — no separate contractors or scheduling gaps.

    Solar Ready

    We configure bi-directional metering and export limits from the outset for new builds with solar, ensuring compliance and feed-in eligibility from day one.

    FAQ

    Frequently asked questions

    Straight answers about metering for new builds in Sydney.

    Ready to Get Started?

    Contact Sedgman Electrics for metering for new builds across Sydney.

    Get In Touch

    Ready to Power
    Your Project?

    Fill out the form and our team will get back to you within 24 hours. We're here to help with all your electrical needs.

    24/7 Support

    (02) 8559 0085

    Response Time

    Within 24 Hours

    0/1000 characters

    By submitting this form, you agree to our privacy policy and terms of service.