Builder's pole supply and installation for Sydney construction sites — single and three phase
A builder's pole is a freestanding temporary power pole installed on a construction site to carry the incoming service mains and temporary switchboard for the duration of the build. Rather than connecting the TBS directly to a building structure that may not yet exist — or that will be demolished — the builder's pole provides a stable, compliant point of attachment for the temporary supply. The pole must be installed to Ausgrid or Endeavour Energy specifications including correct height, setback, and safety clearances, and requires a Level 2 ASP for installation and connection.
Builder's poles are standard on knockdown-rebuild sites across Sydney where the existing structure is demolished before the new build begins, leaving no attachment point for overhead service mains. They are equally common on greenfield lots in growth corridors like Marsden Park, Box Hill, and Oran Park where no infrastructure exists yet. We supply the pole — no need to source separately — and install it to DNSP specifications including the temporary switchboard enclosure, metering provision, and all required safety equipment.

We confirm pole location, setback, clearances, and DNSP connection point relative to the site boundary.
We submit the builder's pole works application to Ausgrid or Endeavour Energy with pole specifications and site plan.
We supply a treated timber or steel pole to DNSP specifications — correct height and class for your network area.
The pole is bored and set, temporary switchboard enclosure mounted, service mains terminated, and all safety equipment fitted.
Temporary meter installed, NMI created, and DNSP energises the pole supply for your construction site.
We confirm pole location, setback, clearances, and DNSP connection point relative to the site boundary.
We submit the builder's pole works application to Ausgrid or Endeavour Energy with pole specifications and site plan.
We supply a treated timber or steel pole to DNSP specifications — correct height and class for your network area.
The pole is bored and set, temporary switchboard enclosure mounted, service mains terminated, and all safety equipment fitted.
Temporary meter installed, NMI created, and DNSP energises the pole supply for your construction site.
Licensed, accredited, and compliant with all NSW electrical and network requirements
Current ASP Class 2A and 2D accreditation registered with NSW Fair Trading, authorising builder's pole installation and temporary service connection works.
Authorised for builder's pole installation across the Ausgrid network area covering Sydney, Inner West, Eastern Suburbs, and Northern Beaches.
Accredited for builder's pole works across Western Sydney, Hills District, and Sutherland Shire Endeavour Energy network areas.
Registered to create temporary NMIs and install metering for builder's pole connections in the AEMO registry.
All temporary switchboard and pole installations completed to the Wiring Rules with certificate of compliance issued.
All pole installation works completed under documented SWMS, excavation safety procedures, and WHS requirements.
After demolition, there is no building structure to attach overhead service mains — a freestanding builder's pole is required.
Greenfield lots with no prior connection point require a builder's pole as the attachment point for temporary supply.
Permanent disconnection for demolition leaves no active connection — a builder's pole establishes a new temporary supply point.
Sites where the building footprint or excavation zone prevents attachment to a structure need a pole positioned outside the work area.
Ausgrid and Endeavour Energy may require a freestanding pole where overhead reticulation or site conditions do not allow direct building attachment.
We provide the pole to DNSP specifications — no need to source materials separately or coordinate deliveries to site.
All builder's poles installed under Ausgrid and Endeavour Energy authorisation with works applications submitted on your behalf.
Pole, switchboard enclosure, metering provision, and service mains all installed by the same team — one contractor, one invoice.
Straight answers about builder's pole installation in Sydney.

Contact Sedgman Electrics for builder's pole installation across Sydney.
Fill out the form and our team will get back to you within 24 hours. We're here to help with all your electrical needs.