    About This Service

    Your Builder's Pole, Supplied & Installed

    A builder's pole is a freestanding temporary power pole installed on a construction site to carry the incoming service mains and temporary switchboard for the duration of the build. Rather than connecting the TBS directly to a building structure that may not yet exist — or that will be demolished — the builder's pole provides a stable, compliant point of attachment for the temporary supply. The pole must be installed to Ausgrid or Endeavour Energy specifications including correct height, setback, and safety clearances, and requires a Level 2 ASP for installation and connection.

    Builder's poles are standard on knockdown-rebuild sites across Sydney where the existing structure is demolished before the new build begins, leaving no attachment point for overhead service mains. They are equally common on greenfield lots in growth corridors like Marsden Park, Box Hill, and Oran Park where no infrastructure exists yet. We supply the pole — no need to source separately — and install it to DNSP specifications including the temporary switchboard enclosure, metering provision, and all required safety equipment.

    Builder's Pole Installation — Sedgman Electrics Sydney
    How We Work

    Builder's Pole Installation Process

    1

    Site Assessment

    We confirm pole location, setback, clearances, and DNSP connection point relative to the site boundary.

    2

    DNSP Application

    We submit the builder's pole works application to Ausgrid or Endeavour Energy with pole specifications and site plan.

    3

    Pole Supply

    We supply a treated timber or steel pole to DNSP specifications — correct height and class for your network area.

    4

    Installation

    The pole is bored and set, temporary switchboard enclosure mounted, service mains terminated, and all safety equipment fitted.

    5

    Metering & Energisation

    Temporary meter installed, NMI created, and DNSP energises the pole supply for your construction site.

    Accreditation

    Fully Accredited & Compliant

    Licensed, accredited, and compliant with all NSW electrical and network requirements

    Level 2 ASP — Class 2A & 2D Accreditation (NSW Fair Trading)

    Current ASP Class 2A and 2D accreditation registered with NSW Fair Trading, authorising builder's pole installation and temporary service connection works.

    Ausgrid Accredited Service Provider

    Authorised for builder's pole installation across the Ausgrid network area covering Sydney, Inner West, Eastern Suburbs, and Northern Beaches.

    Endeavour Energy Accredited Service Provider

    Accredited for builder's pole works across Western Sydney, Hills District, and Sutherland Shire Endeavour Energy network areas.

    Accredited Metering Coordinator (AEMO)

    Registered to create temporary NMIs and install metering for builder's pole connections in the AEMO registry.

    AS/NZS 3000 Wiring Rules Compliant

    All temporary switchboard and pole installations completed to the Wiring Rules with certificate of compliance issued.

    Work Health & Safety Act NSW Compliant

    All pole installation works completed under documented SWMS, excavation safety procedures, and WHS requirements.

    Common Scenarios

    When Do You Need a Builder's Pole?

    01

    Knockdown-rebuild with no existing structure for TBS attachment

    After demolition, there is no building structure to attach overhead service mains — a freestanding builder's pole is required.

    02

    New build on vacant lot with no existing supply infrastructure

    Greenfield lots with no prior connection point require a builder's pole as the attachment point for temporary supply.

    03

    Site where existing supply has been permanently disconnected before construction begins

    Permanent disconnection for demolition leaves no active connection — a builder's pole establishes a new temporary supply point.

    04

    Construction site requiring a freestanding supply point away from the building footprint

    Sites where the building footprint or excavation zone prevents attachment to a structure need a pole positioned outside the work area.

    05

    DNSP requiring a builder's pole as a condition of TBS approval

    Ausgrid and Endeavour Energy may require a freestanding pole where overhead reticulation or site conditions do not allow direct building attachment.

    Why Choose Us

    Why Choose Sedgman for Builder's Pole Installation?

    We Supply the Pole

    We provide the pole to DNSP specifications — no need to source materials separately or coordinate deliveries to site.

    DNSP Approved

    All builder's poles installed under Ausgrid and Endeavour Energy authorisation with works applications submitted on your behalf.

    Complete Package

    Pole, switchboard enclosure, metering provision, and service mains all installed by the same team — one contractor, one invoice.

    FAQ

    Frequently asked questions

    Straight answers about builder's pole installation in Sydney.

    Ready to Get Started?

    Contact Sedgman Electrics for builder's pole installation across Sydney.

    Get In Touch

    Ready to Power
    Your Project?

    Fill out the form and our team will get back to you within 24 hours. We're here to help with all your electrical needs.

    24/7 Support

    (02) 8559 0085

    Response Time

    Within 24 Hours

    0/1000 characters

    By submitting this form, you agree to our privacy policy and terms of service.